News
What we are building, what we have learned and who did it.
Repowering at Cernavodă: 24 turbines become 9
Our first turbines are retiring. In their place comes three times as much energy, on the same land.
The group’s first large battery goes live
60 MWh next to the solar park in Teleorman: noon energy reaches the grid in the evening.
From intern to farm manager in six years
Andreea joined the internship programme in 2019. Today she is responsible for 42 turbines.